  1. Turn off all servers
  2. reposition ups/batteries/servers
  3. read MAC address & then install network admin card into UPS (if applicable)
  4. plug in cables to ups/servers (including network cables & switches)
  5. plug in UPS
  6. configure UPS (cd doesn't work, use serial console port) a. Time/Date b. User password , Authentication Key c. delay on low battery shutdown signal to all servers

  7. install the APC Powerchute Network Shutdown software on all servers (win & linux)

  8. manually test "send shutdown signal" to servers
  9. Start all servers again manually (or using Wake on LAN)
  10. disconnect UPS from mains power and see realtime estimate of "run time" a. disconnect any unnecessary loads if required (e.g. aircon cooler)
  11. Wait until battery runs to "low battery level" and sends shutdown signal for graceful server shutdown
  12. Reconnect mains power to UPS - do servers also restart?